Eaton Moeller® series EMT6 Thermistor overload relay
Article No.:
66167
Part No.:
EMT6-DB
Brand:
Thermistor overload relay for machine protection, 24-240V50/60HZ/DC
Availability:
Forward delivery 4-6 weeks
Part No. | EMT6-DB |
---|---|
UOM | EA |
Weight (KG) | 0.13 |
---|---|
Dimension Width (mm) | 23.00 |
Dimension Height (mm) | 83.00 |
Dimension Depth (mm) | 103.00 |
Description
Thermistor overload relays for machine protection, supply system and error LED display, rated control voltage 24-240V 50-60Hz, 24-240V DC convertible with/without reclosing lockout, for manual or remote resetting, test button, snap fitting
Resources / Data Sheets
Related Products
-
Part No.: ETR4-51-ATiming relay, star-delta, 50 ms, 1W, 3-60s, 24-240VAC/DCUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EMR6-R250-A-1Eaton Moeller® series EMR6 Insulation monitoring relayUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: D2PA4IND2PA4/4 pole, 7A 300V Normal socketUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: XN-322-16DO-P05Digital,16 output,P,24VDC,0.5A,sp. XN-322-16DO-P05UOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EMT6-KDBEaton Moeller® series EMT6 Thermistor overload relayUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: CI-K2-PKZ0-GRInsulated enclosure, for PKZ0, +rotary handle, red/yellowUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EASY-E4-DC-4PE1I/O expansion, For use with easyE4, 24 V DC, Inputs expansion (number) analog: 4, screw terminalUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EMR6-AWM580-H-1Multifunctional phase monitoring relay . EMR6-AWM580-H-1UOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EMR6-IF1-A-1Eaton Moeller® series EMR6 Window-current monitoring relayUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EMR6-A300-C-1Eaton Moeller® series EMR6 Asymmetry monitoring relayUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: EASY-E4-DC-4PE1I/O Expansion for use with easyE4 , 24 V DC Inputs Expansion analog 4, screw terminalUOM: EAAvailability:Forward delivery 4-6 weeks