PowerFlex 40 B Frame Cover Kit
Part No.:
22B-CCB
Brand:
Kit,Communication Adapter Cover,Provides Visibility To Status Lights When Communications Adapter Is Installed,Adds 25 mm To Overall Depth Of The Drive,Use With Powerflex 40 B Frame
Availability:
Forward delivery 4-6 weeks
Part No. | 22B-CCB |
---|---|
UOM | EA |
Weight (g) | 0.17 |
---|---|
Dimension Width (mm) | 11.10 |
Dimension Height (mm) | 6.71 |
Dimension Depth (mm) | 12.80 |
Description
Kit,Communication Adapter Cover,Provides Visibility To Status Lights When Communications Adapter Is Installed,Adds 25 mm To Overall Depth Of The Drive,Use With Powerflex 40 B Frame
Resources / Data Sheets
Related Products
-
Part No.: 23B-D024DF04NN-P3TPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 22B-E6P6N104PowerFlex 40- 4 kW (5 HP) AC DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D010D10ENNPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 22B-B017F104PowerFlex 40 3.7 kW (5 Hp) AC DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D010C104NN-P6TPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D010D10DNN-P6TPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D4P0D10ENN-P6-S1PowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D6P0C10ENN-P6PowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D4P0C10DNN-P6TPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D017CF04NN-P6PowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D010DF04NN-P6-S1PowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeksPart No.: 23B-D017C104NNPowerFlex 40 AC Packaged DriveUOM: EAAvailability:Forward delivery 4-6 weeks