Wiring Accessories

Wiring Accessories

Results 1-40 of 348

Set Descending Direction
per page
Page
View List Grid
  1. DILM150-XVB - Connector, for DILM40-65
    Availability:
    Forward delivery 4-6 weeks
  2.  ZAV-P5 - Shaft extension, for P5, L=480mm
    Availability:
    Forward delivery 4-6 weeks
  3. T0-3-15683/I1/SVB-SW - Main switch, T0, 20 A, surface mounting, 3 contact unit(s), 3 pole, 2 N/O, 1 N/C, STOP function, With black rotary handle and locking ring, Lockable in the 0 (Off) position
    Availability:
    Forward delivery 4-6 weeks
  4. TSQD1CO - Series connection time switch 24 hrs., series connection time switch, autonomy, 3 TLE
    Availability:
    Forward delivery 4-6 weeks
  5. PKE-XRH - Door coupling handle, red yellow, for PKE
    Availability:
    Forward delivery 4-6 weeks
  6.  Eaton Moeller® series PKE Accessory Door coupling handle
    Availability:
    Forward delivery 4-6 weeks
  7. DILM65-XRL - Reversing wiring kit DILM40 to DILM72
    Availability:
    Forward delivery 4-6 weeks
  8. P3-100/IVS - On-Off switch, P3, 100 A, service distribution board mounting, 3 pole, with black thumb grip and front plate, Lockable in the 0 (Off) position
    Availability:
    Forward delivery 4-6 weeks
  9.  B3.1/2-PKZ0 - Three-phase busbar link, Circuit-breaker: 2, 99 mm, For PKZM0-... or PKE12, PKE32 without side mounted auxiliary contacts or voltage releases
    Availability:
    Forward delivery 4-6 weeks
  10. Overload relay, electronic, 20-100A
    Availability:
    Forward delivery 4-6 weeks
  11. Auxiliary contact, operates as an early-make contact, 2N/O early
    Availability:
    Forward delivery 4-6 weeks
  12. Step switches, Contacts: 6, 20 A, front plate: 0-2, 45 °, 2 steps, 45°, maintained, flush mounting
    Availability:
    Forward delivery 4-6 weeks
  13. Changeoverswitches, Contacts: 4, 20 A, front plate: 2>0<1, 45 °, momentary, flush mounting
    Availability:
    Forward delivery 4-6 weeks
  14. On-Off switch, 2 pole, 20 A, 90 °, flush mounting
    Availability:
    Forward delivery 4-6 weeks
  15. Control transformer, 200VA, 1p, primary 400V, secondary 230V
    Availability:
    Forward delivery 4-6 weeks
  16. Control transformer, 100VA, 1p, primary 400V, secondary 24V
    Availability:
    Forward delivery 4-6 weeks
  17. Control transformer, 60VA, 1p, primary 400V, secondary 230V
    Availability:
    Forward delivery 4-6 weeks
  18. Power supply unit, 3-phase, 400-500VAC/24VDC, 10A
    Availability:
    Forward delivery 4-6 weeks
  19. Power supply unit, 3-phase, 400-500VAC/24VDC, 5A
    Availability:
    Forward delivery 4-6 weeks
  20. On-Off switch, 3 pole, 63 A, flush mounting
    Availability:
    Forward delivery 4-6 weeks
  21. Main switch, 3 pole, 32 A, Emergency-Stop function, Lockable in the 0 (Off) position, rear mounting
    Availability:
    Forward delivery 4-6 weeks
  22. Safety position switch, 1N/O+1N/C, insulated material, +actuator ZB, screw connection
    Availability:
    Forward delivery 4-6 weeks
  23. Safety position switch, 1N/O+1N/C, insulated material, +actuator ZB, screw connection
    Availability:
    Forward delivery 4-6 weeks
  24. Position switch, 1N/O+1N/C, rounded plunger
    Availability:
    Forward delivery 4-6 weeks
  25. RC suppressor circuit, 110-240VAC, for DILM40-95
    Availability:
    Forward delivery 4-6 weeks
  26. Auxiliary contact module, 1N/O, side, screw connection
    Availability:
    Forward delivery 4-6 weeks
  27. Auxiliary contact module, 1 N/C, side, screw connection
    Availability:
    Forward delivery 4-6 weeks
  28. Insulated enclosure, HxWxD=160x100x100mm, +mounting plate
    Availability:
    Forward delivery 4-6 weeks
  29. Busbar adapter, 55mm, 63A, 2TS
    Availability:
    Forward delivery 4-6 weeks
  30. Busbar adapter, 45mm, 16A, 2TS cage
    Availability:
    Forward delivery 4-6 weeks
  31. Busbar adapter, 45mm, 32A, 2TS
    Availability:
    Forward delivery 4-6 weeks
  32. RJ45 CAT 6.  Y7-175548
    Availability:
    Forward delivery 4-6 weeks
  33. 16A SCHUKO SOCKET.  F9317
    Availability:
    Forward delivery 4-6 weeks
  34. 63NHG00B - Fuse-link, low voltage, 63 A, AC 500 V, NH00, gL/gG, IEC, dual indicator
    Availability:
    Forward delivery 4-6 weeks
  35. Changeoverswitches, Contacts: 8, 63 A, front plate: 1-0-2, 90 °, maintained, surface mounting
    Availability:
    Forward delivery 4-6 weeks
  36. Main switch, 6 pole + 1 N/O + 1 N/C, 63 A, Emergency-Stop function, 90 °, Lockable in the 0 (Off) position, surface mounting
    Availability:
    Forward delivery 4-6 weeks
  37. Changeoverswitches, Contacts: 8, 32 A, front plate: 1-0-2, 90 °, maintained, surface mounting
    Availability:
    Forward delivery 4-6 weeks
  38. Main switch, 4 pole, 63 A, Emergency-Stop function, 90 °, flush mounting
    Availability:
    Forward delivery 4-6 weeks
  39. Residual-current circuit breaker trip block for FAZ, 63A, 2p, 30mA, type A
    Availability:
    Forward delivery 4-6 weeks
  40. Over current switch, 63A, 2p, C-Char, AC
    Availability:
    Forward delivery 4-6 weeks

Results 1-40 of 348

Set Descending Direction
per page
Page
View List Grid